The felt roof of the mower shed was in desperate need of replacement. When Lee kindly offered to replace it with fibreglass we jumped at the offer. When the felt was removed the roof planking was found to be in very poor condition and required some replacement planks. The roof was then covered with sheets of Stirling board. Alan carried out the work under terrible weather conditions, 20 mph winds and thick fog. A few days later the sky had cleared, but it was still blowing a 20 mph wind which made handling the fibreglass cloth a challenge. Lee was up to though and we now have a weather-proof shed which should last quite a few years.